YWCA Sun 'n' Fun Pool, Lubbock, TX

Built 1963, Renovated 2006

Scope of work:
• Installed new main drains and perimeter piping

• Raised depth from 12 to 9 ft
• Installed zero-depth entry
• Relocated pump room



 


www.natare.com

Town of Clayton, New Mexico
Built 1949, Renovated 2002

Scope of work:
• Raised depth from 10 to 6 ft
• Installed new main drains & piping
• Renovated pump room
• Installed PVC lining system

Design by K.S. Berry Engineering



www.natare.com

Kirtland AFB Olympic Pool
Albuquerque, New Mexico
Renovated 2003

Scope of work:
• Installed PVC lining system
• Leak tested and repaired existing

    stainless steel gutter

 


City of Farmington Aquatic Center
Farmington, New Mexico
Water playground, Renovated 2002


City of Rio Rancho, New Mexico
Spray Park, New installation 2000

Home | Service | Training | Renovation | Chemical Automation | 1-888-701-7665 (POOL) | Email Us
©2005 PoolPro, LLC. Website design ©2005 Amanda Ferri. Artwork ©2005 Kate Wyman.